Germany: Thomas Strobl, the Deputy Minister-President of Baden-Württemberg, has opened Alba Nordbaden’s refuse-derived fuel (RDF) plant in Karlsruhe. The plant has an RDF production capacity of 33,000t/yr for use at power and cement plants. The unit uses a Lindner Polaris 2800 shredder that can shred materials to 80mm or less in a single step, according to Construction Cayola. Alba Nordbaden specified a crusher that could handle an input rate of 20t/hr.