Displaying items by tag: Tariff Commission
Philippines: Holcim Philippines has conducted media tours of its Lugait cement plant in Misamis Oriental to raise awareness of its import of processed engineered fuels (PEF) from Australia. In May 2019 containers from Australia arrived at the Mindanao International Container Terminal in Tagoloan, Misamis Oriental, but were reported as misdeclared by the Bureau of Customs, according to the Sun Star newspaper. However, Frederic Vallat, Holcim Philippines' vice-president for Alternative Fuels and Alternative raw material and head of Geocycle, said that the Tariff Commission had classified the shipment as PEF in early June 2019. The Environmental Management Bureau also notified the Bureau of Customs that it had no objection to imports of PEF.
The PEF shipment was described as, "a plastic based fluffy fuel with high calorific value consisting by weight, 75 – 85% flexible plastics, paper and natural and hydrocarbon based fibre, 7 – 15% hard plastics, 1 – 5% wood and < 1 – 5% non-combustible inert material in the form of solid flakes (range of particle sizes less than 50 mm), mixed colours with natural odour." It added that the PEF has a gross calorific value of 5700 - 7200kcal/kg, 15% ash content, 20% moisture, 1.5% sulphur and 1% chlorine. It is sourced from municipal wastes such as plastics, rubber, wood, paper, textiles, glass, metals, food materials, broken furniture, and other damaged or discarded articles.
Vallat said that at present, Holcim Philippines has stopped the import of PEF from Australia. They are now in dialogue with the Bureau of Customs over the issue. The company would like to import PEF locally but it was only able to source 7000t in 2018 and its plant needs up to 60,000t/yr.