Displaying items by tag: Beumer
Germany: Märker Zement has ordered a single-source alternative fuels (AF) storage and conveying system for its Harburg, Bavaria cement plant from Germany-based Beumer. The supplier says that the line will consist of a 700m pipe conveyor, silos, distribution equipment and a screen. It will be equipped with a BG OptiFeed screw weigh feeder. It will connect the preheater both to an existing warehouse and a new one at the site. The line will handle two different qualities of refuse-derived fuel (RDF) and shredded tyres. It will be operated at a maximum capacity of 40t/hr. Commissioning is scheduled for 2022.
US: The Portland Cement Association (PCA) has named Beumer Group winner of its Chairman’s Manufacturing Performance Award 2020. The award is for economical and sustainable operations. It acknowledges Beumer Group’s alternative fuels and raw materials (AFR) systems business unit’s achievements in supporting cement producers with complete systems to supply calciners and main burners with alternative fuels and raw materials, the main component of which is the pipe conveyor. "I am very honoured to receive this recognition on behalf of Beumer Group,” said Brian Giese, Beumer Corporation Director of Business Development, Conveying & Loading. "It demonstrates our commitment to support cement manufacturers in their efforts to make production greener and more sustainable."
Business development, conveying and loading director Brian Giese said, "I am very honoured to receive this recognition on behalf of Beumer Group. It demonstrates our commitment to support cement manufacturers in their efforts to make production greener and more sustainable."
Germany: Beumer Group has developed a screw weigh feeder with automatic calibration. The company says it is especially well suited to exact and controlled feeding of inhomogeneous bulk materials of densities between 0.08t/m3 and 0.80t/m3 and extremely high moisture content such as alternative fuels. Its capacity is 30t/hr and its weighing tolerance is between 1% and 2%. It is completely covered to prevent dust and other environmental stresses.
Beumer supplies alternative fuels conveying and feeding system for Dyckerhoff’s Deuna cement plant
16 February 2018Germany: Beumer is supplying a conveying and feeding system for alternative fuels for Deuna Zement’s plant in Thuringia. Umweltdienste Bohn, based in Alsfeld, was commissioned to supply the subsidiary of Dyckerhoff with alternative fuels and will build a processing plant on Deuna’s premises as part of this partnership.
As the general contractor, Umweltdienste Bohn engaged the Beumer Group for a conveying and feeding system using a pipe conveyor. The scope of supply also includes three feeding hoppers with a screw conveyor, belt conveyor, rotary starscreens and scales as well as steel structure, electronics and controls. Commissioning is scheduled for February 2018.