Bolivia: Empresa Minera Industrial’s 0.1Mt/yr integrated cement plant has resumed operations across both dry lines following a fuel shortage. Tinformas has reported that a natural gas shortage caused the suspension of operations in November 2019 following an attack on a pipeline.
