Germany: Intercem has been contracted to optimise the secondary fuel dosing system at an unnamed German cement plant. The scope of delivery includes disassembly on site, refurbishment of the trough chain conveyors that will be re-used, construction of a new bunker and installation of the refurbished screws. The engineering, as well as the assembly of the new components and the provision of the necessary cranes, hoists and other equipment, are also included.